1 – prepare the plot by smoothing the ground and outlining the shape in white chalk

2 – excavating the footprint

3 – building a series of cement block squares that are painted with water-proof paint, then a rebar metal frame in placed inside and the inside is filled with liquid cement, then the surrounding space is re-filled with dirt

4 – creating the sub-base (plinth) and foundation slab by packing earth over the filled-in cement squares, then building up a low cement exterior wall (the outline of the house) and low cement block walls (the interior load-bearing walls), each of these sections are filled in packed earth then covered with a layer of cement – rebar is set into this foundation and sticks up from the smoothed cement base – the result is a base about one meter off the ground with smooth cement walls and a surface which is marked by the tops of cement blocks (6″ or more high) which show the outline of the interior walls

5 – building walls of cement block reinforced with columns of steel and cement (created from liquid cement that is poured into wooden forms constructed around the rebar)

6 – the house begins to take shape

(in second posting)

7 – poles are set up to support wooden forms for the ceilings/ roof/ floors of upper stories

8 – the second story is constructed

9 – the roof is poured using a stretch pumper and the roof wall is built

10 – the major construction is now finished and the house can stay in this unfinished state for months

11 – exterior finishing is added: plaster/ paint, windows and doors

12 – the boundary wall is built